Shortdata

ShortData.co.uk tracks all short positions in UK companies listed on the London stock exchange. All information shown on this site is for information purposes only. While every effort has been made to ensure the accuracy of the information shown, it should not be relied upon for any investment or trading decisions.

Home » Share Chat Forum » SHANTA GOLD LIMITED (SHG) Share Chat

EPIC

Company

Industry

Country of Incorporation

Trading Currency

LSE Market

SHG

Basic Resources

Guernsey

GBX

AIM

Posts: 262
Opinion: No Opinion
Posted: November 20, 2017

SHG Singida JORC Resource Estimate & Operations

RNS Number : 9049W
Shanta Gold Limited
20 November 2017

20 November 2017

Shanta Gold Limited

("Shanta Gold", "Shanta" or the "Company")

Singida JORC Resource Estimate and NLGM Operations Update

Shanta Gold (AIM: SHG), the East Africa-focused gold producer, announces a JORC compliant Mineral Resource Estimate ("MRE" or "Resource") on the Singida Gold Mining Project ("Singida" or "the Project") in Central Tanzania and provides an operational update for its New Luika Gold Mine ("NLGM"), in Southwest Tanzania.

Highlights

Singida

· JORC compliant Resource at Singida totaling 12.3 Mt, grading 1.84 g/t and containing 728koz of gold using a cut-off grade of 1.0 g/t consisting of:

o Measured and Indicated Mineral Resource totaling 5.11 Mt, grading 2.09 g/t gold and containing 345 koz of gold, and;

o Inferred Resource of 7.17 Mt, grading 1.66 g/t gold and containing 383 koz of gold.

· The MRE incorporates three mining licenses and seven mineralised zones with a combined strike length of 4.9 km, with widths ranging from 5-15m and mineralisation extending approximately 500m below the topographical surface;

· Gold Tree 1, which is at the centre of the three mining licenses, contains measured and indicated resources of 1.1 Mt, grading 3.14 g/t gold and containing 111 koz of gold at a cut-off grade of 1.0 g/t is located near to surface (